Schedule of Tests and their Procedures


Please sign in to view the rest of this entry.

Schedule of Tests and their Procedures
10106031031600 Schedule of Tests and their ProceduresSynopsisThe chapter covers the classification of different tests and their procedures. The schedule of tests have been categorised mainly in three different groups : (a) Routine test (Sl. no. 1 to 8); (b) Type test (Sl. no. 9 and 10); (c) Special test (Sl. no. 11 to 15). Routine tests are performance-based and should be carried out on all transformers. Type and special tests are for verification of design and may be carried out on one transformer of each design. However, the temperature rise test may be conducted on one unit against eac…
Citation
Indrajit Dasgupta: Design of Transformers. Schedule of Tests and their Procedures, Chapter (McGraw-Hill Professional, 2002), AccessEngineering Export