PLANNING STAGE


Please sign in to view the rest of this entry.

PLANNING STAGE
10104011030300 PLANNING STAGEPrevention is better than cure cannot be truer than in case of leakage and seepages.To minimise the problems of dampness, leakage and seepage, best course is to take precautions in the initial stages of the project. These include: Steps required at the Planning Stage Steps required to be taken during the Execution Stage. Care during utilisation of utilities.