A Guide to Estimating Project Cost Using ISBSG Data


Please sign in to view the rest of this entry.

A Guide to Estimating Project Cost Using ISBSG Data
10304001011401A Guide to Estimating Project Cost Using ISBSG DataAlthough the ISBSG collects the costs incurred by projects as a project attribute in its repository, it is very difficult to standardize these costs as a ratio of “dollar cost per function point delivered” that can be used to predict the likely cost of a newly planned project. Difficulties in using other projects’ total costs arise due to the following factors: The costs subm…
Citation
Peter R. Hill: Practical Software Project Estimation: A Toolkit for Estimating Software Development Effort & Duration. A Guide to Estimating Project Cost Using ISBSG Data, Chapter (McGraw-Hill Professional, 2011), AccessEngineering Export